Contact Information
Aircraft Details
- Price: $13,995,000
- Year: 2013
- Make/Model: Gulfstream G280
- Registration Number: N459BN
- Power: Turbo Fans
- Engines: 2 Engines
- Class: Business Jets
- Listing ID: 6200575
- Partner ID: 87607
- Posted On: Jun 11, 2024
- Updated On: Jul 3, 2024
Description
1 U.S. Corporate Owner Since New
Engines Enrolled on MSP
APU Enrolled on MSP
Low Time, Meticulously Maintained
Equipped with GoGo Wi-Fi System
Equipped with Synthetic Vision System
Airframe:
Total Time: 2,398.5
Total Landings: 1,556
Engines:
Time: 2353/2388
Cycles: 1532/1553
Avionics
Three Collins Flight Display Systems
Collins HF 9031A HF Transceiver
Dual Collins RIU-4110 Radio Interface Units
Three Collins VHF-4000E COMM Transceivers
Dual Collins ADP-4120 Audio Control Panels
Cobham C406N 406 MHZ ELT
Three Collins AFD-6510 Display Units
Collins TSS-4100 Traffic Surveillance
Dual Collins GPS-4000S Receiver
Synthetic Vision Primary Flight Display
Collins FCP-5110 Flight Control Panel
Dual Collins NAV-4500/4000 VHF NAV
Quick Access Recorder
Enhanced Flight Recorder (CVR/DFDR)
Collins RTA-4118 Multi-Scan Weather Radar
Collins TPM-6000 TAWS
Dual Collins ADC-3010 Air Data Computers
Dual Collins DME-4000 DME
Interior
PAX 9
FWD 4 place club configuration
AFT 3 place divan opposite 2 club seats
Galley FWD galley
LAV Aft lavatory
Additional Sink, storage drawers, ice drawers, Enflight coffee
maker, Enflight high temp oven in galley
Exterior
White with Orange and Black Stripes
Additional Features
FANS 1/A
ADS-B Out
TCAS 7.1
RVSM
WAAS-LPV
CPDLC
DFDR
EGPWS
XM WX
Cobham
GoGo ATG-5000 Wi-Fi System
Rosen Blue-Ray DVD Player with Media Server
Rosen 19 FWD Cabin Monitor
Rosen 19 AFT Cabin Monitor
Rosen 7 Galley Touch Screen Control Panel
ICG Cabin and Cockpit Phone Handsets
Modifications / Conversions:
ADS-B Out Software Upgrade Oct. 2018
Talon Aerospace LED Lamps Oct. 2016
FANS Upgrade Nov. 2015
ATG High Speed Data System Oct. 2013
SATCOM System and Antenna Oct. 2013
Rockwell Collins Second IFIS Oct. 2013
XM Weather Receiver and Antenna Oct. 2013
Remarks:
1C Inspection Sep. 2023 Sep. 2024
2C Inspection Sep. 2023 Sep. 2024
4C inspection Feb. 2022 Feb. 2026
8C Inspection Oct. 2021 Oct. 2029
16C Inspection N/A Oct. 2029